EUGAL European Gas Connector Pipeline Lots 1 and 2

Previous slide
Next slide

Pipe and civil engineering works for the new construction of the EUGAL, lots 1 and 2, two lines

Section Lubmin – Ferdinandshof (near Lübs), Mecklenburg-Western Pomerania

Lot 1

  • Two 37.2 km DN 1400 pipelines
  • 2 shut-off stations in Wrangelsberg and Groß Polzin
  • 2 transfer stations in Lubmin

Lot 2

  • Two 33.7 km DN 1400 pipelines
  • 2 shut-off stations in Pelsin and Lübs
  • Crossing of Peene River, line 1 + 2 (Microtunnel DN 2400, approx. 1,050 m
  • Parallel laying with centre distance < 4 m for approx. 5 km
  • Laying in bog sections over approx. 7.5 km
  • Execution in joint venture

August 2018 – December 2020