Klaipeda LNG Storage and Loading Station

EPC construction of a new LNG storage and loading station

Klaipeda, Lithuania

  • 5 vacuum-insulated storage tanks: 1,000 m3 each, diameter approx. 6 m, length 53 m, 223 to
  • 10 evaporators (height 10 m)
  • 2 truck filling stations
  • 2 LNG truck filling pumps
  • 2 LNG bunker pumps
  • Complete station is designed for handling LNG (- 163 °C)
  • Foam extinguishing system with 8 foam generators
  • Jetty module (for receiving LNG from the carrier)
  • 2 truck scales (weighbridge)
  • Execution in joint venture

February 2016 until October 2017

AB Klaipeda Nafta, Lithuania