New construction of a middle distillate pipeline between the refinery site and TransTank tank farm in Gelsenkirchen
Gelsenkirchen, North Rhine-Westphalia
Laying of 1.4 km DN 200, PN 100 including accompanying cable in own cable conduit and leak detection and location system (LEOS)
Crossing of external pipelines
July 2019 – March 2020
Chemical industry