Connection of a new turbo compressor machine unit including integration to the station piping system

Krummhörn, Lower Saxony (Germany)

  • Extension of the main pressure and main piping (underfloor)
  • Laying of unit piping (above ground)
  • Integration of pumping prevention pipeline of the new machine unit
  • Installation of auxiliary systems (expansion, instrument air system)

Over 900 weld joints were made in the Quakenbrück shop on assemblies with nominal diameters from DN 25 to DN 1000.

February to July 2018

Open Grid Europe GmbH

Project information