New construction of district heating line 7 BA 3 in Augsburg

New construction of a district heating pipeline

Augsburg, Bavaria (Germany)

Delivery and ready-to-operate laying of 1,466 linear metres of DN 350 district heating pipeline

Material: Plastic casing pipe
Design parameters: Max. design temperature 130 C°
Max. design pressure PN 25

  • 2 crossings using the drill-press method (protective pipes DN 700, local track 15 m and roadway 33 m)
  • Execution in joint venture

March to September 2019

swa Netze GmbH