New construction of pipe lines 27/2/2 Stockum - Bockum-Hövel and 27/2/4 Merschhoven-Daberg

Pipe and civil engineering works for the new construction of two natural gas pipelines

North Rhine-Westphalia

  • Pipeline 27/2/3 Stockum – Bockum-Hövel
  • 4,000 m DN 300, DP 70 bars
  • New construction of 2 slide gate stations
  • Pipeline 27/2/4 Merschhoven-Daberg
  • 1,900 metres DN 100
  • New construction of 2 valve stations
  • 5 crossings using the drill-press method
  • 2 parallel HDD crossings canal/Lippe
  • Use of automatic technology in the front construction
  • Joint venture work execution

February 2020 – April 2021

Open Grid Europe GmbH