Zwei­brücken-Bellheim fuel line refurbishment

Verification of faults after pig run and refurbishment

Rhineland-Palatinate, Germany

  • Exposing the DN 200 pipeline in operation at 13 selected locations distributed over the approx. 74.2 km long section
  • Removal of the existing pipe coating in the area of the faults
  • Expert inspection (TÜV)
  • Re-insulation and refilling
  • Pipe replacement at 3 fault areas

Partial laying in nature reserve areas and steep slopes

March to May 2019

LBB Kaiserslautern regional contracting office

Project information